TDPIEndo, President, chief of Toba namekawa factory manager KimuraThank you for your continuous support.Today, thank you for meeting you in my busy.The report is as follows.In trouble, please confirm.Date and time, September 29 (tree) at 10 amLocation: DTPI conference roomAttendance: Toba DTPI by factory manager, director, KimuraAs IE: MURAOKAHonda: Ronald DharmaThe UV cut film is stuck on the illuminating lamp order from Japan than IIn step 2, on the water areaOn September 20, IE Tech by tank into the scheduleIn the completion of the tank 97 last weekend. To mount the doorIn the production of the perfect cure for not going to the dust.The test operation plan at the end of October IE Tech by waterTest out the water, 97 at because of the need to continue after the testConstruction of Dharma until mid-November, drainage, water supply , air power to complete the work.From the tank into the construction of drainage pipe in the tankPart of the wall through pipe, the outlet for the maintenance of the installation. We have arranged by IEIn IE 97 at your siteThe rain gutter (stainless steel) to promote repairDoor canopy flushing confirm again.The building (toilet) of rain water discharge pipe, the relationship between the trough (two stage construction.4 in the clean room repair of rain leakage from the ceiling. When confirming the leak.The roof was investigated in the ceiling, but I couldn"t find where rain leakageIn the viewing room at the time of leaking reaffirmsOn August 8, to confirm the location of rainwater infiltration. The owner of the house air conditioner wiringThrough laboratory through the roof. First aid in the sealing materialThe only water is used as the plastic hose to water supply line F OfficeTo replace a large pipe construction.6 August 30 in the application for the permission to bring in the Tokai signature.97 on September 21, the applicant for a license to PEZA. The payment of expenses to be PEZA from Tokai7 from the pure water system planning in wastewater treatment plant effluent.September 29, 97, take orders. November to allow water to 20.The review of the repair of concrete pipe wrap and the level of Christ.To adjust the level of cover 97.The compressor for preventing water repairing concrete.The design of the clean booth in the clean room.In the clean room can be set up to the supply of fresh air filterTo devise a system.More than that, please point out where I was there.The next meeting, October 14 (gold) 10:00 am to schedule.Thank you and please you.
翻訳されて、しばらくお待ちください..
