By using each input and output check sheet referred to below, to implement the I / O check.
Attached to that I / O check sheet, in order to become a thing of the first unit (B5-11),
check the electrical drawings for each Unit,
I / O and can correct if there is a check sheet and the difference be checked out.
Doing the following before output check.
① to be the OFF NFB all power system.
② Unplug the air of residual pressure, closing the main valve.
翻訳されて、しばらくお待ちください..
