Komiya president Eguchi adviser everyone
we become very care on a regular basis.
The weekly work report NO103 we attached.
And sorry to trouble you, but, please confirm.
1, the waste water from the laundry, the factory will consider reviewing the test value from to the production
environment corrective work on 2,2D building assembly area
cleaning chamber is adjust to the clean room and the environment equivalent to
the cleaning chamber and clean room <<< mounted between differential pressure gauge. Differential pressure gauge is get paid than MPC like
relocation plan 3, and air conditioning in the wash chamber after the completion of the cleaning chamber around construction work in MPC-1 Canteen.
4, MPC-1 roof repairs
<<< November 11, purchase order acceptance
three-story part is final coat complete
warehouse building sealant filling, undercoat start
concrete gutter, repair of the parapet will begin cleaning than next week.
5, MPC-2 300 ton press construction
start of an epoxy finish paint than <<< 19 December
6, MPC-1 private fire fighting equipment work
<<< December 6, the rising concrete completion of the first floor unit.
Finish the start of construction of the pump chamber than December 19,
the mounting of the piping support hardware, laying the start of the main pipe from the rear of the building
7,2D Building 2F part, emergency lights three locations is replaced with a new one the lamp body because it does not light up.
2D building, charging is also very lights installed in the Canteen building, we will continue to check the lighting at any time.
Place where non-point there will be replaced with a new one.
Not point three places of <<< 2D building 2F has confirmed the exchange to 21 days on (charge).
During the next week the other emergency lighting will complete the investigation.