A is, B than deliverable delivery is made the day from 10 days of (hereinafter referred to as the "test period".) Within perform the acceptance inspection of the deliverable on the basis of the test specifications drawn up by the previous section, the delivery object is proper when it was the top of the inscribed seal to test pass certificate, to deliver it to B. Case was improper by the same inspection, A is assumed to seek immediate notification and correction to that effect to the B.
翻訳されて、しばらくお待ちください..
