Respect to review of the title, I have sent a request for correction, but there is no answer.
I hope answered within 24 days in July when to be submitted to Hitachi.
(1) 316ss material inspection report (already requested on 15 jul 2013)
a) many iso dwg indicated material no. Which are missing in the inspection report.
B) material no. Shown on the iso dwg to be corresponded with material analyzing data.
c) class ms,be a different color display on the line.
p & id on ms2 on the p & id and iso dwg to be correponded.
(2) when will you submit revised work procedure of insulation?
(3) rt inspection record
a) summary sheet to be revised according to instruction on 22 jul 2013