Whether the defective product prepared in 3 pieces 3 preparations preparations preparations for use in preparation study of oil at the oil at the code amount at around around around at the setup setup setup setup setup at 2. 5. The number of weight number at the number 2 at the (① ⑤) whether abnormal product must be setup at one of those goods falling number those pieces of those times. Note: Note: Note: at the time of the load at the time (H) (H) is stopped at the high (H) setup material exchange equipment failure maintenance plan adjustment at the metal mould replacing other. Stop. Stop. At the other.Production team leader at the time, the leader of the production number::.
翻訳されて、しばらくお待ちください..
