In addition, in the case of Fig. 2 and the evaporation portion of the partition plate, the surface condition of the cylinder between the inspection could not be GMP on structure. In addition, the heat exchange portion in the evaporation chamber into the system, the overall length of the evaporator is increased, and the rise of the installation height of the MWS.
翻訳されて、しばらくお待ちください..
