Submitted to (Ito) a copy & pdf a) 8 月 15 day.
Local set and b) The subjects were a cone roof tank that was entered in the local tank work.
A) (inspection unnecessary. On-site for the tested at the factory shop fabrication equipment) submitted to (Ito) a copy & pdf 8 July 13, 2010.
Submitted in demand to a) aweco.
(Submission hope August 19) (inspection report is submitted. Hitachi to return already. Aweco compiled after Hitachi)
(Okubo) compiled in
(Okubo) compiled in
The submission to the material kao corrective report a) 5 月 2nd.
B) 5 月 3 日 sampling inspection pass. Because of the lack of information by (kao Onogi Mr. witness.)
A) record filing failure, are being conducted by
wasa the compensation work. (Cover material: summary sheet, iso dwg, data)