1.5 Stage 2 phase construction worth of branch number of circuits that are implemented in the construction work, seizure of space (to implement the site investigation is necessary)
The number of the branch circuit of the second period construction has been implemented in 1.5 stage construction, space control, field survey carried out if necessary.