Length Tsuseisakusho Yamanoi like
CC: SPPI Ishii like
Thank you for your help.
Depending on your renovation plan we received the other day, but we have to create the current quotation, processing the electrical capacity was calculated, it does not be covered in the electrical piping STARTS recommendation has pre-buried we found.
When calculated in the machine list of currently planning, machine only in 975.7KVA air conditioning system 148KVA other hoist crane, compressor, heat exchanger, including office equipment, etc., in the case of consideration of the safety factor, your company's contract power becomes 1,500KVA you.
If you exceed the 1000KVA transformer lease in MERALCO becomes impossible, it will be beneficiary burden, you will be installing the transformer in your company.
If you have installed a transformer in-house compensation to fit in MERALCO You no longer required, it will be relatively cheap electricity fee per Kw / h, there is also a benefit.
If attached to the installation using a high-pressure receiving of 34,500v the transformer of 1500KVA in the room (air conditioning machine room of the plan), we estimate also includes a transformer of 1500KVA.
(Duct bank towards the high pressure receiving, both cost-effective for wiring)
to report more, thank you.